Worldway AMC
Battery Room Remodel (2013)
The project consisted of a remodel to the existing USPS Air Mail Facility Battery Room & Hoist System. RJC Inc. and proposed team member structural engineer Les Tso of Kanda Tso Structural Engineering performed a structural assessment of the existing concrete 2nd floor concrete floor system. A new jib crane battery hoist system was specified and designed to exactly fit the space replacing the existing system shown below in yellow. The new hoist system is in blue and yellow. The new system provides more load capacity and flexibility in operation. The approximate construction cost was $125,000. RJC provided design, JOC negotiation, and construction administration.
(All images are post-construction)